Landline Contact Number
0731-8512 8016

This project is located in Luohu District, Shenzhen, with a total installed capacity of 0.1643 MWp.The total power generation during the contract period is approximately 4.7255 million kWh, equivalent to a cumulative standard coal saving of about 1,512.16 tons and a total CO₂ emission reduction of about 3,846.56 tons.
The project fully utilizes the idle building rooftops and parking lot resources of the Luohu District Water Bureau of Shenzhen Municipality, effectively reducing building energy consumption. It is a concrete practice in actively responding to the national strategic goals of "carbon peaking and carbon neutrality," and holds significant demonstration significance for promoting the green and low-carbon development of public institutions and optimizing the regional energy structure.