Customer Service Hotline
0731-8512 8016
The project is located in Wanzhou District, Chongqing, specifically in the truck and car parking lots of Chongqing Xiangyu Salt Chemical Co., Ltd.'s factory area. It involves investing in and operating an electric vehicle charging station, equipped with facilities capable of meeting the daily charging needs of various electric vehicles in the factory (with scalable expansion available on demand).
For the truck parking lot, the configuration includes 1 unit of 400kW dual-gun DC fast charging pile, 3 units of 360kW dual-gun DC fast charging piles, and 1 unit of 480kW charging stack. The car parking lot is equipped with 1 unit of 120kW dual-gun DC fast charging pile and 6 units of 7kW single-gun AC slow charging guns. This setup can fully satisfy the charging requirements of electric vehicles within the factory, helping the enterprise reduce operational costs, realize green operations, and respond to the "dual carbon" goals.